Build Progress · 2026

The lodge, rising stone by stone.

Follow the new facility as it takes shape on the footprint of the 200-year-old homestead — hand-laid stone, suites, studio and pool.

Where we are

Walls up, roof next.

Foundations are poured, the stone plinth is laid, and the room layout — suites, central living, studio wing and pool — is now clearly readable from the air. Here's the latest from site.

Phase 01 — Layout & plinth
Main lodge & pool

The full footprint from above — suites and central living to the left, the lap pool taking shape alongside, and the studio wing beyond. Stone foundation walls follow the natural contour of the land.

Phase 02 — Walls & rooms
Suite walls & stonework

Room divisions rise in plastered brick over a hand-laid stone base — the same stone vocabulary as the original homestead, carried into every suite and boundary wall.

Phase 03 — In the valley
Set in the landscape

Seen wide, the lodge sits low and long against the Magaliesberg veld — close to the tree line and the spring, far from anything else.

Phase 04 — On the ground
Stone & plaster, up close

At eye level the texture comes through — warm ochre plaster over stone and brick, slot windows framing the veld, and the approach road curving in past the windmill.

Done
Foundations & plinth
Now
Walls & stonework
Next
Roof & pool
2026
Target opening